BASEBALL FIELD PRODUCTS

sport.jpeg

INFIELD MIXES

BULKAMERICAN INFIELD MIXBULKRED BRICK DUST

INFIELD CONDITIONERS

50# BAGPRO'S CHOICE SOILMASTER (CALCINATED CLAY)50# BAGSOILMASTER PLUS

MOUND AND HOME PLATE CLAY

50# BAGPRO'S CHOICE PRO MOUND (CLAY)BRICKSPRO'S CHOICE PRO MOUND/HOME PLATE BRICKS (CLAY)50# BAGDIAMOND PRO MOUND/HOME PLATE CLAY(RED)BRICKSDIAMOND PRO MOUND/HOME PLATE CLAY BRICKS

WARNING TRACK MIX

BULKWARNING TRACK NUGGETSBULKDECOMPOSED GRANITE

CALL US: (800) 266-6380


PRO'S CHOICE SOILMASTER

Pros Choice Red Soilmaster

BASE PATHS - apply 3 to 4 bags of Soilmaster to each base path and sratch in with rake or nail drag.

HOME PLATE AREA - use 2 to 3 bags to spread lightly in batters boxes and around home plate.

PITCHERS MOUND - spread 1 to 2 bags over the mound to take care of surface moisture.

SOILMASTER™

INFIELD CONDITIONER

  • Blends easily into existing infield mix.

  • Permits faster return to play after rain ...... eliminating puddles, muddy conditions and slick spots.

  • Prevents excessive compaction of infield soil and promotes superior drainage qualities.

  • Retains moisture to keep playing surface virtually dust free, firm and resilient .... without dry-out or cracking.

  • Highly durable .... designed to keep infields in top condition season after season.

INFIELD CONDITIONING - TOP 1"

  • If infield surface is hard and compacted, moisten the area prior to incorporating Soilmaster.

  • Spread Soilmaster over entire infield, adding additional amounts to problem areas.

  • With the use of a nail drag, rake or tine harrow, work the Soilmaster into the top one inch of soil and then smooth out the surface with a drag mat.

  • Topdress with twenty bags of Soilmaster and drag again.


RECOMMENDED QUANTITIES FOR SKINNED AREAS
Regulation Field
Softball Fields
Little League
*Renovation - Top 3"
12 tons (480 bags)
10 tons (400 bags)
5 tons (200 bags)
Conditioning Top 1"
6 tons (240 bags)
5 tons (200 bags)
2 tons (80 bags)


* Application rates of Soilmaster can vary depending on current field conditions. A general guideline to follow when renovating the top 3" of an infield is to apply 1.5 tons of Soilmaster per 1000 sq ft. of skinned area.

Soilmaster is packaged in 50lb. bags and shipped on pallets - 40 bags per pallet (1 ton). Also available in bulk shipments of 22-25 tons.

INFIELD RENOVATION - TOP 3"

Position bags of Soilmaster evenly over the entire skinned area of the infield. Empty bags into piles and spread Soilmaster over the surface.

Position bags of Soilmaster evenly over the entire skinned area of the infield. Empty bags into piles and spread Soilmaster over the surface.

Using a rototiller, blend Soilmaster into the top 3" of soil. Then mat darak to breakup any clumping and to complete the blending process.

Using a rototiller, blend Soilmaster into the top 3" of soil. Then mat darak to breakup any clumping and to complete the blending process.

Moisten the infield lightly and roll with a one-ton roller or hand roller. This will smooth and firm up the playing surface, allowing it to settle.

Moisten the infield lightly and roll with a one-ton roller or hand roller. This will smooth and firm up the playing surface, allowing it to settle.

Continue to drag the infield slowly until spots are level and the soil has loosened. Then top-dress with a minimum of twnty bags of Soilmaster and fine drag the surface again.

Continue to drag the infield slowly until spots are level and the soil has loosened. Then top-dress with a minimum of twnty bags of Soilmaster and fine drag the surface again.


PRO MOUND™

Pro Mound is a unique packing clay that bonds to form a solid surface base at the mound and batters box area.

  • Allows pitchers and batters to "dig-in" and establish the footing they need without creating large holes.

  • Quick and easy to install requiring only a shovel, rake, tamp and water..

  • Packaged in convenient-to-use plastic bags which can be stored outside.

  • Highly durable packing clay that remains firmly intact, is long lasting and easy to manage.

Pros Choice Pro Mound

Pros Choice Pro Mound

INSTALLING PRO MOUND™

1. Remove the top 4 inches of soil from high wear areas: in front of the rubber, plateau and landing areas or, completely to the circle perimeter as shown.

1. Remove the top 4 inches of soil from high wear areas: in front of the rubber, plateau and landing areas or, completely to the circle perimeter as shown.

2. At the batters boxes and catchers station also remove 4 inches of soil. This can be contained to only the wear areas or the entire box dimensions. Once the areas are prepared and ready for addition of PRO MOUND™, apply water to the bottom of each area and let it soak in. This will help to form a bonding base with the existing soil.

2. At the batters boxes and catchers station also remove 4 inches of soil. This can be contained to only the wear areas or the entire box dimensions. Once the areas are prepared and ready for addition of PRO MOUND™, apply water to the bottom of each area and let it soak in. This will help to form a bonding base with the existing soil.

3. Apply a two inch layer of PRO MOUND™ to each excavated area and compact firmly with tamp. Then lightly water these areas prior to adding the next two inch layer.

3. Apply a two inch layer of PRO MOUND™ to each excavated area and compact firmly with tamp. Then lightly water these areas prior to adding the next two inch layer.

4. The next layer will bring the PRO MOUND™ to near grade level. After it is tamped firmly cover each area with a skin coating of infield soil and tamp again.

4. The next layer will bring the PRO MOUND™ to near grade level. After it is tamped firmly cover each area with a skin coating of infield soil and tamp again.

5. It is recommended that the mound and batters' boxes be lightly watered and tarp covered when not in use. If this is not possible, covering them with a light coating of SOILMASTER can assist in maintaining correct moisture levels.

5. It is recommended that the mound and batters' boxes be lightly watered and tarp covered when not in use. If this is not possible, covering them with a light coating of SOILMASTER can assist in maintaining correct moisture levels.

REPAIR

Sweep out any divots made in the PRO MOUND™ and use a rake to level off high spots. Then moisten the area to be repaired, fill the divots with PRO MOUND™ and tamp again. Approximately fourty 50lb bags of PRO MOUND™ are needed to resurface and maintain the mound, batters boxes and catchers station.

PRO MOUND™ is packaged in 50lb bags and shipped on pallets - 40 bags per pallet.

RAPID DRY®

  • Works quickly to soak up puddles and makes fields playable.

  • Works efficiently, producing desired results with minimum effort.

  • Works better because its granular structure encourages rapid absorption.

  • Works longer because the particles are heat treated and will remain rigid.

    RAPID DRY, a field drying agent, consists of fine granular particles that have been baked (calcined) to insure durability and to increase absorption capabilities The fine-sized granular structure of RAPID DRY speeds the wicking and absorption of excess water while improving soil consistency and helping to reduce compaction. Puddles disappear, safer footing is restored, and games play on schedule.

    Long lastingRAPID DRYeasily mixes into the soil, stays there, and continues working to absorb excess water that may accumulate.

    RAPID DRY, the game-saving quick fix, is for wet and muddy ball diamonds, football and soccer fields, and is easy and economical in use.

    RAPID DRYis packaged in 50lb. bags and shipped

General application: Spread a covering of RAPID DRY soil conditioner over a soggy surface using any spreader or by hand. Once the water is absorbed, work the material into the soil with a rake or use a drag on large areas. Continue to apply until desired surface condition is achieved.

General application:
Spread a covering of RAPID DRY soil conditioner over a soggy surface using any spreader or by hand. Once the water is absorbed, work the material into the soil with a rake or use a drag on large areas. Continue to apply until desired surface condition is achieved.

AMERICAN INFIELD MIX

  • Proper blend of Clay and Brick Dust.

  • The Sports Turf Management Association recommended blend.

  • Most Major League teams throughout the US use this blend.